In the name of TEIAS General Directorate soil investigation has been carried out in Atesehir and Kavacik for 380/33 kv G.I.S substations and then shoring and soil improvement projects have been prepared. Additionally, soil improvement has been fulfilled for the substation that is planned to be constructed in Atasehir. Within the scope of the project, a total of 570 m ø80 cm and 1.640 m ø65 cm sub-base bored piles have been constructed and an excavation of 8.500 m³ has been carried out.