Shoring design and construction have been carried out in Istanbul Leather Organized Industrial Site (IDOSB) for the proposed Iskefe Deri factory. Within the scope of the project, a total of 800 m ø65 cm and a total of 1.800 m ø80 cm bored piles, a 8.600 m prestressed anchorage and a 1.300 sqm shotcrete area with soil nailing have been completed. During the construction process, horizontal displacements have been tracked with mirror reflectors and inclinometers.
Services given: