Within the scope of the project, a total of 5.000 m ø100 cm shoring piles, 6.500 m ø100 cm retaining wall foundation piles, 11.000 m permanent anchors, 8.000 m permanent soil nails, 16.000 m jet grout columns have been constructed. In addition, within the scope of control test; a total of 4 soil investigation borings, a pile loading test (up to 300 tons), jet grout loading tests, pile integrity tests (PIT), and lateral displacement checks with the help of a inclinometer have been carried out.