Geotechnical evaluations have been made for soil problems at existing BSH Home Appliances plant in Tekirdag, Cerkezkoy, as well as for the buildings planned to be built. An excavation design has also been carried out.
Settlement problems have been identified in the Container Storage area and to eliminate them, a soil improvement project of controlled compressed granular fill with the use of geogrid has been prepared.
A retaining wall project for the factory border has been completed. Based on soil conditions, internal and external stability problems have been identified.A braced excavation project has been completed for the 'Extended Mashine Foundation' pit.
Services given: